
New homes / Dubai
Off-plan properties
in Dubai
Explore new developments by location and developer. A growing project collection, with the details that help you compare.
Browse off-plan projects
Coming soon / Pre-launch enquiry
Palm Springs by Nakheel
Register your interest with Grange to receive updates as official project information becomes available.
Project details, pricing, payment terms, launch timing and availability remain subject to developer confirmation. Registering interest does not reserve a property or confirm an allocation.
Register your interestOff-plan project collection
Browse off-plan projects
Compare projects using developer-sourced details. Filter by location to explore Dubai, Abu Dhabi and Ras Al Khaimah. Ask Grange for the latest handover schedule where a date has not been confirmed.
Price-check dates are shown with individual project information. Completion information reviewed 11 November 2026. Published inventory and advertised starting prices are labelled separately. Subject to availability; fees and current terms require confirmation.
Browse by budget
Compare published starting prices in AED. Numeric price ranges exclude sold-out projects; current availability and terms require confirmation.
Search project names and refine your results with the filters below.
No projects match your search and filters. Try another name or reset your selections.

Dubai / Al Furjan
Orvessa Residences by Michel Adam
Target handover: Q3 2028
Indicative payment plan: 10% on booking, 40% during construction, 50% on completion. Confirm current terms for the selected unit.
1-bedroom apartments; 2-bedroom apartments; 3-bedroom apartments; Retail
A 92-home development in Al Furjan with one- to three-bedroom apartments. Planned shared facilities include a rooftop pool, co-working space, outdoor yoga area and family seating.
Project information
Prices, availability, unit specifications, payment terms and handover require developer confirmation for the selected home. Handover dates are developer targets, not guarantees.
Official developer information · Checked 11 November 2026.
Developer visualisation, indicative only; not a photograph of a completed home.
Developer completion reference · Checked 11 November 2026. Developer targets can change.

Dubai / Al Jaddaf
Ramada Residences by Wyndham
Published handover target: Q1 2026; actual completion confirmation pending
1-bedroom apartments; 2-bedroom apartments; Retail
A Wyndham-branded residential development in Al Jaddaf with 108 apartments and two retail units. Amenities include a swimming pool, gym, residents’ lounge and outdoor theatre. The developer currently marks the project sold out.
Project information
This is a project reference, not an offer of available property. No homes are advertised as available through this entry.
Official developer information · Checked 11 November 2026.
Developer visualisation, indicative only; not a photograph of a completed home.
Completion information rechecked 11 November 2026. Published developer or sales-partner target; confirm the selected property’s current contractual schedule with Grange.
Completion source

Dubai / Dubai Marina
Maréa by BNW Developments
Completion date: awaiting developer confirmation
1-bedroom apartments; 2-bedroom apartments; 3-bedroom apartments; Retail
A waterfront residential project in Dubai Marina with one-, two- and three-bedroom apartments and retail space. BNW presents Maréa as a coastal address combining marina views with access to the surrounding city.
Project information
Prices, availability, unit specifications, payment terms and handover require developer confirmation for the selected home. Handover dates are developer targets, not guarantees.
Official developer information · Checked 11 November 2026.
Developer visualisation, indicative only; not a photograph of a completed home.
Developer completion reference · Checked 11 November 2026. Developer targets can change.

Ras Al Khaimah / RAK Central
Radisson Blu Hotels and Residences
Target handover: Q4 2029
Indicative payment plan: 10% on booking, 40% during construction, 50% on completion. Confirm current terms for the selected unit.
Studios; 1-bedroom apartments; 2-bedroom apartments; 3-bedroom apartments; Hotel residences; Retail; Kiosks
A mixed-use hospitality and residential address in RAK Central. The scheme brings together Radisson Blu residences and a hotel component with pools, fitness facilities, dining and shared leisure spaces.
Project information
Prices, availability, unit specifications, payment terms and handover require developer confirmation for the selected home. Handover dates are developer targets, not guarantees.
Official developer information · Checked 11 November 2026.
Developer visualisation, indicative only; not a photograph of a completed home.
Developer completion reference · Checked 11 November 2026. Developer targets can change.

Ras Al Khaimah / Al Marjan Island
Tonino Lamborghini Residences
Target handover: Q4 2028
Indicative payment plan: 10% on booking, 10% within 30 days, 50% in staged instalments, 30% on completion. Confirm current terms for the selected unit.
Studios; 1-bedroom apartments; 2-bedroom apartments; 3-bedroom apartments; Penthouses; Villas; Mansions
An Italian-branded coastal development on Al Marjan Island with cascading terraces and landscaped spaces. Its residential collection ranges from studios and apartments to penthouses, villas and mansions.
Project information
Prices, availability, unit specifications, payment terms and handover require developer confirmation for the selected home. Handover dates are developer targets, not guarantees.
Official developer information · Checked 11 November 2026.
Developer visualisation, indicative only; not a photograph of a completed home.
Developer completion reference · Checked 11 November 2026. Developer targets can change.

Ras Al Khaimah / Al Marjan Island
La Perla
Target handover: Q4 2027
Indicative payment plan: 10% on booking, 40% during construction, 50% on completion. Confirm current terms for the selected unit.
1-bedroom apartments; 2-bedroom apartments; 3-bedroom apartments; Penthouses; Duplexes
A boutique development of 57 residences on Al Marjan Island. The design combines terraced balconies, courtyard spaces and loft-inspired layouts, with a rooftop pool, spa and outdoor cinema among the planned amenities.
Project information
Prices, availability, unit specifications, payment terms and handover require developer confirmation for the selected home. Handover dates are developer targets, not guarantees.
Official developer information · Checked 11 November 2026.
Developer visualisation, indicative only; not a photograph of a completed home.
Developer completion reference · Checked 11 November 2026. Developer targets can change.

Ras Al Khaimah / Al Marjan Island
Aqua Maya
Target handover: Q4 2027
Indicative payment plan: 10% on booking, 40% during construction, 50% on completion. Confirm current terms for the selected unit.
1-bedroom apartments; 2-bedroom apartments; 3-bedroom apartments; 4-bedroom apartments; Retail
A coastal residential building on Al Marjan Island with 99 apartments and two retail units. Wave-inspired balconies, landscaped seating areas, a swimming pool and a children’s play pavilion shape the development.
Project information
Prices, availability, unit specifications, payment terms and handover require developer confirmation for the selected home. Handover dates are developer targets, not guarantees.
Official developer information · Checked 11 November 2026.
Developer visualisation, indicative only; not a photograph of a completed home.
Developer completion reference · Checked 11 November 2026. Developer targets can change.

Ras Al Khaimah / Al Marjan Island
FashionTV Acacia
Target handover: Q2 2028
Indicative payment plan: 10% on booking, 40% during construction, 50% on completion. Confirm current terms for the selected unit.
1-bedroom apartments; 2-bedroom apartments; 3-bedroom apartments; 4-bedroom penthouses; Retail
A FashionTV-branded development on Al Marjan Island with 228 residences. The collection includes one- to three-bedroom apartments and four-bedroom penthouses, supported by landscaped gardens, an infinity pool and fitness facilities.
Project information
Prices, availability, unit specifications, payment terms and handover require developer confirmation for the selected home. Handover dates are developer targets, not guarantees.
Official developer information · Checked 11 November 2026.
Developer visualisation, indicative only; not a photograph of a completed home.
Developer completion reference · Checked 11 November 2026. Developer targets can change.

Ras Al Khaimah / Al Marjan Island
Taj Wellington Mews
Target handover: Q1 2028
Indicative payment plan: 10% on booking, 50% before completion, 40% on completion. Confirm current terms for the selected unit.
Studios; 1-bedroom hotel apartments; 2-bedroom hotel apartments; 3-bedroom hotel apartments; Retail
A Taj-branded hotel apartment development on Al Marjan Island, arranged across two connected towers. Fully furnished homes are complemented by dining, wellness spaces, a swimming pool and an open-air cinema.
Project information
Prices, availability, unit specifications, payment terms and handover require developer confirmation for the selected home. Handover dates are developer targets, not guarantees.
Official developer information · Checked 11 November 2026.
Developer visualisation, indicative only; not a photograph of a completed home.
Developer completion reference · Checked 11 November 2026. Developer targets can change.

Ras Al Khaimah / Al Marjan Island
Aquino
Target handover: Q2 2027
1-bedroom apartments; 2-bedroom apartments; 3-bedroom apartments
A low-rise coastal development on Al Marjan Island with 29 one-, two- and three-bedroom apartments. Shared facilities include an outdoor gym, swimming pool, children’s pool, landscaped areas and barbecue space.
Project information
Prices, availability, unit specifications, payment terms and handover require developer confirmation for the selected home. Handover dates are developer targets, not guarantees.
Official developer information · Checked 11 November 2026.
Developer visualisation, indicative only; not a photograph of a completed home.
Developer completion reference · Checked 11 November 2026. Developer targets can change.

Ras Al Khaimah / Al Marjan Island
Pelagia
Target handover: Q4 2027
Indicative payment plan: 10% on booking, 40% during construction, 50% on completion. Confirm current terms for the selected unit.
1-bedroom apartments; 2-bedroom apartments; 3-bedroom apartments; 4-bedroom apartments; Retail
An Al Marjan Island residential development with 158 apartments and two retail spaces. Its planned leisure facilities include a rooftop infinity pool, yoga deck, gym, children’s play areas and landscaped relaxation spaces.
Project information
Prices, availability, unit specifications, payment terms and handover require developer confirmation for the selected home. Handover dates are developer targets, not guarantees.
Official developer information · Checked 11 November 2026.
Developer visualisation, indicative only; not a photograph of a completed home.
Developer completion reference · Checked 11 November 2026. Developer targets can change.

Ras Al Khaimah / Al Marjan Island
Aqua Arc
Target handover: Q3 2027
Indicative payment plan: 10% on booking, 40% during construction, 50% on completion. Confirm current terms for the selected unit.
1-bedroom apartments; 2-bedroom apartments; 3-bedroom apartments; Penthouses; Townhouses
A twin-tower coastal development on Al Marjan Island with 226 units. The residential offering includes apartments, townhouses and penthouses, alongside walking trails, an infinity pool, gym and family recreation areas.
Project information
Prices, availability, unit specifications, payment terms and handover require developer confirmation for the selected home. Handover dates are developer targets, not guarantees.
Official developer information · Checked 11 November 2026.
Developer visualisation, indicative only; not a photograph of a completed home.
Developer completion reference · Checked 11 November 2026. Developer targets can change.
Ras Al Khaimah / Al Marjan Island
Dolce Residences by Wyndham
Target handover: Q4 2028
Residential units; Retail
An announced boutique branded development on Al Marjan Island from BNW Developments and Wyndham Hotels & Resorts. Plans comprise 93 residences and five retail spaces, with handover targeted for the fourth quarter of 2028.
Project information
Announced project. Bedroom mix, launch details and sales availability require developer confirmation. Prices, availability, unit specifications, payment terms and handover require developer confirmation for the selected home. Handover dates are developer targets, not guarantees.
Official developer information · Checked 11 November 2026.
Completion information rechecked 11 November 2026. Published developer or sales-partner target; confirm the selected property’s current contractual schedule with Grange.
Completion source
Dubai / Jumeirah Village Circle
Esplora
Published handover target: Q4 2025; actual completion confirmation pending
Studios; 1-bedroom apartments; 2-bedroom apartments; Retail
A 16-storey residential development in Jumeirah Village Circle, offering studios and one- and two-bedroom apartments alongside three retail units. BNW describes a total of 146 residential and commercial units.
Project information
Portfolio reference: current sales availability and completion status are unverified. Prices, availability, unit specifications, payment terms and handover require developer confirmation for the selected home. Handover dates are developer targets, not guarantees.
Official developer information · Checked 11 November 2026.
Completion information rechecked 11 November 2026. Published developer or sales-partner target; confirm the selected property’s current contractual schedule with Grange.
Completion source

Dubai / Business Bay
Berkeley Tower
Completion date: awaiting developer confirmation
Indicative payment plan: 20% on booking, 50% in staged instalments, 30% on completion. Confirm current terms for the selected unit.
Grade A offices · 60 floors
Berkeley Tower is an off-plan Grade A office development by Ellington Properties in Business Bay, Dubai. The 60-floor tower combines office space with co-working facilities, a clubhouse, fitness facilities and automated robotic parking.
Project information
Amenities are planned across five levels, including three dedicated amenity floors and facilities on the ground and mezzanine levels.
Current prices, availability, payment terms and handover require confirmation with Grange for the selected office.
Official developer information · Checked 11 November 2026.
Developer visualisation, indicative only; not a photograph of a completed building.
Developer completion reference · Checked 11 November 2026. Developer targets can change.

Dubai / Jumeirah Islands
Serenia District | East Residence 2
Anticipated completion: 30 June 2030
Indicative payment plan: 60/40: 10% immediately, 10% after 30 days, four further 10% instalments, 40% upon completion. Confirm current terms for the selected unit.
2, 3 and 4-bedroom apartments · 25 floors
East Residence 2 is a 25-floor collection of two-, three- and four-bedroom apartments within Serenia District at Jumeirah Islands. Palma’s plans place the tower within a landscaped lakeside community, with outlooks towards Jumeirah Islands, Emirates Living and the Dubai skyline, depending on the home.
View East Residence 2 floor plans and area schedules (PDF)
Project information
Floor plans and layouts
View floor-by-floor layouts (PDF)
- 2-bedroom Type 04A: 1,352 sq ft total (PDF)
- 3-bedroom Type 01A: 2,248 sq ft total (PDF)
- 4-bedroom Type 02A: 2,835 sq ft total (PDF)
- Garden and podium apartment plans (PDF)
These are examples from Palma’s November 2026 presentation, not confirmed available homes. Total areas include terraces where shown. The plan pages provide the internal and terrace area breakdowns. Layouts, dimensions, specification and availability require developer confirmation for the selected home.
Designed in collaboration with Nikken Sekkei, the tower uses Japanese-inspired proportions, warm materials and restrained lighting. The published layouts include conventional apartments and podium garden homes, with substantial differences between internal and terrace areas.
The November brochure advertises a headline total-area range of 1,316–5,364 sq ft. Layouts and outside space vary by home; this headline is not a substitute for the individual unit plan.
Published example: three-bedroom Type 01A totals 2,248 sq ft, comprising 2,035 sq ft internal space and a 213 sq ft terrace. The brochure also includes a four-bedroom garden layout totalling 5,364 sq ft, including a 2,877 sq ft terrace. These are layout examples, not confirmed available units.
Serenia District’s planned facilities centre on a 100,000 sq ft Signature Clubhouse across four levels, with an infinity pool, gym and dedicated ladies’ gym, spa facilities, rooftop café, indoor sports, games and cinema rooms, children’s facilities, and retail and dining spaces. The wider community is organised around health and social life, sports and recreation, family activities, nature and wellness.
Indicative 60/40 payment plan: 10% immediately, 10% after 30 days, then 10% on each of 1 June 2027, 1 January 2028, 1 June 2028 and 1 June 2029. The final 40% is scheduled for 30 June 2030.
The developer’s indicative payment schedule runs to 30 June 2030. Palma separately advertises anticipated completion on 30 June 2030; confirm contractual delivery and handover terms for the selected residence. Confirm the contractual completion and handover terms for the selected residence.
Prices are developer-advertised starting prices checked on 10 November 2026, not quotations for a confirmed available unit. Prices, availability, areas, payment terms and delivery dates remain subject to change and contract. Confirm applicable fees, final specification, parking, outlook and any current incentives with Grange before committing. No discount or incentive is assumed.
Developer visualisations are indicative, not photographs of completed homes. Views, furniture, landscaping and finishes depend on the selected home and final delivery.




Developer completion reference · Checked 11 November 2026. Developer targets can change.

Dubai / Jumeirah Islands
Serenia District | East Residence 3
Anticipated completion: 30 June 2030
Indicative payment plan: 60/40: 10% immediately, 10% after 30 days, four further 10% instalments, 40% upon completion. Confirm current terms for the selected unit.
1 and 2-bedroom apartments · 23 floors
East Residence 3 is a 23-floor collection of one- and two-bedroom apartments at Serenia District, Jumeirah Islands. The developer positions it between the lakeside setting and the urban outlook towards Jumeirah Lake Towers, within a walkable community with shared leisure and wellness facilities.
View East Residence 3 floor plans and area schedules (PDF)
Project information
Floor plans and layouts
View floor-by-floor layouts (PDF)
- 1-bedroom Type 05A: 870 sq ft total (PDF)
- 2-bedroom Type 01A: 1,395 sq ft total (PDF)
- Garden and podium apartment plans (PDF)
These are examples from Palma’s November 2026 presentation, not confirmed available homes. Total areas include terraces where shown. The plan pages provide the internal and terrace area breakdowns. Layouts, dimensions, specification and availability require developer confirmation for the selected home.
Nikken Sekkei’s Japanese-inspired design is expressed through simple proportions, warm lighting and a more social podium setting. The published apartment plans vary by floor and orientation, including garden layouts with larger outdoor areas.
The November brochure advertises a headline area range of 875–1,605 sq ft. It is not exhaustive: individual published plans include an 851 sq ft one-bedroom layout and a 2,688 sq ft garden two-bedroom layout. Confirm the internal area and terrace area for the exact home.
Published plans include both conventional and garden apartments. Areas shown in the marketing material include outside space where stated; do not compare total area with internal living area. Ask Grange for the exact plan and its internal/terrace split. Published plans do not establish live availability.
Serenia District’s planned facilities centre on a 100,000 sq ft Signature Clubhouse across four levels, with an infinity pool, gym and dedicated ladies’ gym, spa facilities, rooftop café, indoor sports, games and cinema rooms, children’s facilities, and retail and dining spaces. The wider community is organised around health and social life, sports and recreation, family activities, nature and wellness.
Indicative 60/40 payment plan: 10% immediately, 10% after 30 days, then 10% on each of 1 June 2027, 1 January 2028, 1 June 2028 and 1 June 2029. The final 40% is scheduled for 30 June 2030.
The developer’s indicative payment schedule runs to 30 June 2030. Palma separately advertises anticipated completion on 30 June 2030; confirm contractual delivery and handover terms for the selected residence. Confirm the contractual completion and handover terms for the selected residence.
Prices are developer-advertised starting prices checked on 10 November 2026, not quotations for a confirmed available unit. Prices, availability, areas, payment terms and delivery dates remain subject to change and contract. Confirm applicable fees, final specification, parking, outlook and any current incentives with Grange before committing. No discount or incentive is assumed.
Developer visualisations are indicative, not photographs of completed homes. Views, furniture, landscaping and finishes depend on the selected home and final delivery.




Developer completion reference · Checked 11 November 2026. Developer targets can change.

Dubai / Dubai Maritime City
Shahrukhz Residences
Target completion / handover: Q4 2029
Studios, 1–3 bedroom apartments and penthouses
Shahrukhz Residences is a waterfront residential project in Dubai Maritime City, with furnished studios, one- to three-bedroom apartments and penthouses. It is separate from the Shahrukhz office tower on Sheikh Zayed Road.
Project information
Danube presents a coastal setting with more than 40 planned amenities. The advertised facilities include a beach-inspired lagoon, a rooftop club overlooking the sea, an indoor gym and a sports hub. The location places the development near Port Rashid and the Dubai Cruise Terminal. Views, furnishings and the precise layout should be confirmed for the chosen home.
Developer-advertised anticipated completion: Q4 2029. Starting price checked 28 October 2026; subject to availability and change. Contact Grange to confirm current units, prices, payment schedule and completion terms.
Developer visualisation, indicative only; not a photograph of a completed home.
Developer completion reference · Checked 11 November 2026. Developer targets can change.

Dubai / Academic City
Greenz
Target completion / handover: Q4 2029
3–5 bedroom townhouses and villas
Greenz is a gated community near Academic City, offering three- and four-bedroom townhouses and five-bedroom villas. Danube describes furnished homes with private outdoor space and contemporary layouts across a planned collection of 768 residences.
Project information
The community plans combine landscaped areas with fitness, leisure and family facilities. Advertised amenities include swimming pools, a running track, tennis and padel courts, a spa and children’s activity areas. The location is close to Dubai Silicon Oasis, with connections to Emirates Road and Dubai–Al Ain Road. Ask Grange for the floor plan, plot dimensions and current terms of the specific home.
Developer-advertised anticipated completion: Q4 2029. Starting price checked 28 October 2026; subject to availability and change. Contact Grange to confirm current units, prices, payment schedule and completion terms.
Developer visualisation, indicative only; not a photograph of a completed home.
Developer completion reference · Checked 11 November 2026. Developer targets can change.

Dubai / Jumeirah Village Circle
Serenz
Target completion / handover: 2029
Studios and 1–3 bedroom apartments
Serenz is a planned 50-storey residential development in Jumeirah Village Circle, offering studios and one-, two- and three-bedroom apartments. Danube lists 1,250 apartments and a broad collection of shared leisure facilities.
Project information
The advertised amenities include swimming pools, landscaped gardens, jogging tracks and fitness and wellness areas. Family facilities include children’s play areas and pools, while sports options include padel and tennis. Its JVC setting offers access to the surrounding residential community and Dubai’s main road network. Confirm the apartment’s layout, outlook, parking allocation and final specification with Grange before selecting a home.
Developer-advertised anticipated completion: 2029. Starting price checked 28 October 2026; subject to availability and change. Contact Grange to confirm current units, prices, payment schedule and completion terms.
Developer visualisation, indicative only; not a photograph of a completed home.
Developer completion reference · Checked 11 November 2026. Developer targets can change.

Dubai / Dubai Sports City
Aspirz
Developer dates differ: Q4 2028 / January 2030; confirmation required
Indicative payment plan: 1% monthly instalment option advertised; deposit, milestones and balance to be confirmed. Confirm current terms for the selected unit.
Studios, 1–3 bedroom apartments and offices
Aspirz combines residential apartments and offices in Dubai Sports City. Danube’s headline project information lists 432 apartments and 266 offices, with studios and one- to three-bedroom residential formats.
Project information
The residential concept includes convertible Flex layouts designed to provide different room configurations; the arrangement depends on the unit type. Planned facilities include an infinity pool, indoor and outdoor gyms, padel, a basketball court and a cricket pitch. Business and social facilities include a business centre, podcast studio, cinema and games room. Grange can help confirm whether a particular enquiry is for a residence or an office and obtain its exact layout and specification.
Developer dates differ: Q4 2028 / January 2030; confirmation required. Starting price checked 28 October 2026; subject to availability and change. Contact Grange to confirm current units, prices, payment schedule and completion terms.
Developer visualisation, indicative only; not a photograph of a completed home.
Developer completion reference · Checked 11 November 2026. Developer targets can change.

Dubai / Al Furjan
Sparklz
Target completion / handover: Q2 2028
Studios and 1–3 bedroom apartments
Sparklz is a residential development in Al Furjan with 356 apartments, including studios and one- to three-bedroom homes. Danube describes convertible layouts among the options, allowing some homes to adapt their room configuration.
Project information
More than 30 amenities are advertised, including an infinity pool, indoor and outdoor gyms, a spa, outdoor cinema, business centre and daycare. Sports and leisure facilities include padel and mini golf. The project’s location is near Gardens Metro and Ibn Battuta Mall. Ask Grange to confirm which convertible arrangement applies to the selected apartment, together with its size, outlook and final specification.
Developer-advertised anticipated completion: Q2 2028. Starting price checked 28 October 2026; subject to availability and change. Contact Grange to confirm current units, prices, payment schedule and completion terms.
Developer visualisation, indicative only; not a photograph of a completed home.
Developer completion reference · Checked 11 November 2026. Developer targets can change.

Dubai / Dubai Silicon Oasis
Timez
Target completion / handover: Q2 2028
Studios and 1–3 bedroom apartments
Timez is a residential project in Dubai Silicon Oasis with 1,000 apartments and a mix of studios and one- to three-bedroom homes. Its distinguishing feature is a range of convertible apartment layouts.
Project information
Danube describes configurations in which a studio can become a one-bedroom layout and a one-bedroom home can become a two-bedroom layout. This flexibility is specific to the selected apartment and should be checked against its floor plan. The surrounding district includes parks, schools, cafés and retail, with access to Dubai–Al Ain Road and Sheikh Mohammed Bin Zayed Road. Grange can confirm the usable space and configuration of current options.
Developer-advertised anticipated completion: Q2 2028. Starting price checked 28 October 2026; subject to availability and change. Contact Grange to confirm current units, prices, payment schedule and completion terms.
Developer visualisation, indicative only; not a photograph of a completed home.
Developer completion reference · Checked 11 November 2026. Developer targets can change.

Dubai / Business Bay
Bayz 102
Target completion / handover: June 2029
Studios, 1–4 bedroom apartments and penthouses
Bayz 102 is a planned 102-level residential tower in Business Bay, offering furnished studios, one- to four-bedroom apartments and penthouses. Danube’s headline information lists 956 apartments and describes Italian Dolce Vita furniture.
Project information
The project is near Dubai Canal, Business Bay Metro and Sheikh Zayed Road. Advertised shared facilities include an infinity pool, indoor and aquatic gyms, a jogging track, outdoor cinema and sports areas. Some homes are described as having private pools; this is not a feature of every apartment. Views and furnishings also depend on the chosen unit, so Grange should confirm the exact specification and current options.
Developer-advertised anticipated completion: June 2029. Starting price checked 28 October 2026; subject to availability and change. Contact Grange to confirm current units, prices, payment schedule and completion terms.
Developer visualisation, indicative only; not a photograph of a completed home.
Developer completion reference · Checked 11 November 2026. Developer targets can change.
Dubai / Jumeirah Golf Estates
Sold out
Jouri Hills
Previously published completion target: June 2026; current handover status to confirm
3 and 4 bedroom townhouses; 5 bedroom villas; 6 bedroom mansions
A 294-home residential community within Jumeirah Golf Estates, with townhouses, villas and mansions.
Sold out by the developer. No homes are advertised as available through this entry. Checked 21 October 2026.
View project detail
Jouri Hills combines contemporary homes with landscaped surroundings, smart-home features and a neighbourhood park. The wider Jumeirah Golf Estates community includes the Earth and Fire golf courses.
This is a project reference, not an offer of available property. No current price, payment plan or handover date is quoted.
Official Arada project information · Developer sold-out announcement
Completion information rechecked 11 November 2026. Arada’s 2025 offering circular published a June 2026 expected completion date. This has passed and is not proof of completed handover.
Completion source

Dubai / Jumeirah Golf Estates
Ashwood Estates
Completion date: awaiting developer confirmation
4, 5 and 6 bedroom villas
Discover Ashwood Estates within Wasl’s Jumeirah Golf Estates – The Next Chapter, a freehold master-planned destination in Me’aisem First, Dubai, bringing together golf, tennis, equestrian facilities and landscaped outdoor spaces.
Project information and sources
Official Ashwood Estates source · Jumeirah Golf Estates – The Next Chapter. Image is a developer visualisation of a five-bedroom villa. Contact Grange to confirm current availability, prices, plot sizes, payment plans and handover terms for the specific home.
Developer completion reference · Checked 11 November 2026. Developer targets can change.
Dubai / Dubai Islands
Ellington Sands
Brochure target for Ellington Sands I: Q2 2028; confirm phase-specific latest schedule
Indicative payment plan: 20% on booking, 50% in staged instalments, 30% on completion. Confirm current terms for the selected unit.
1–4 bedroom apartments
A beachfront residential development by Ellington Properties, with a design-led approach to life by the sea.
View illustrated project profileProject information and sources
Price basis: developer-advertised starting price. Official price source.
Official developer source. Images are developer visualisations. The labelled developer-advertised price is shown above. Current inventory and handover remain unconfirmed.
Completion information rechecked 11 November 2026. Published developer or sales-partner target; confirm the selected property’s current contractual schedule with Grange.
Completion source
Dubai / Business Bay
The Crestmark
Published original completion target: Q1 2026; current handover status to confirm
Indicative payment plan: 20% on booking, 50% in staged instalments, 30% on completion. Confirm current terms for the selected unit.
Studios and 1–3 bedroom apartments
Contemporary residences by Ellington Properties, set alongside the Dubai Water Canal in Business Bay.
View illustrated project profileProject information and sources
Official developer source. Images are developer visualisations. No current inventory, price or handover claim is made.
Official pricing reference · Checked 18 October 2026.
Completion information rechecked 11 November 2026. Published developer or sales-partner target; confirm the selected property’s current contractual schedule with Grange.
Completion source

Dubai / Dubai Islands, Island E
Bay Estate
Target completion: January 2031
Townhouses; attached villas; garden villas; villa plots
Release update, 16 October 2026: Dubai Holding Real Estate reported the first Bay Estate release fully booked. Earlier launch and EOI information is historical; current release and availability require confirmation.
View project detail
Bay Estate by Nakheel in Dubai Islands, Island E, Dubai.
Target completion: January 2031. Developer targets may change. Ask Grange to confirm current options and terms.
Official project information
Official pricing reference · Checked 18 October 2026.
Developer visualisations are indicative and do not show current construction or finished condition.
Completion information rechecked 11 November 2026. Published developer or sales-partner target; confirm the selected property’s current contractual schedule with Grange.
Completion source

Dubai / Dubai Sports City
MAG 777
Target handover: Q1 2027
Apartments
View project detail
MAG 777 by MAG in Dubai Sports City, Dubai.
Target handover: Q1 2027. Developer targets may change. Ask Grange to confirm current options and terms.
Official project information
Official pricing reference · Checked 18 October 2026.
Developer visualisations are indicative and do not show current construction or finished condition.
Completion information rechecked 11 November 2026. Published developer or sales-partner target; confirm the selected property’s current contractual schedule with Grange.

Dubai / JVC District 13
Xenia Residence
Target completion: March 2027
Indicative payment plan: 3-year flexible plan; detailed instalments require confirmation Confirm current terms for the selected unit.
Studio; 1 and 2 bedroom apartments
View project detail
Price basis: developer-advertised starting price. Official price source.
Xenia Residence by NYX Properties in JVC District 13, Dubai.
Target completion: March 2027. Developer targets may change. Ask Grange to confirm current options and terms.
Official project information
Developer visualisations are indicative and do not show current construction or finished condition.
Developer completion reference · Checked 11 November 2026. Developer targets can change.

Dubai / Edge of Dubai's extended urban area
Keturah Ardh
Phase I plot handover target: Q4 2026; not finished-home delivery
Residential masterplan; released types available on request
View project detail
Keturah Ardh by MAG in Edge of Dubai's extended urban area, Dubai.
Phase I plot handover target: Q4 2026; not finished-home delivery. Developer targets may change. Ask Grange to confirm current options and terms.
Official project information
Official pricing reference · Checked 18 October 2026.
Developer visualisations are indicative and do not show current construction or finished condition.
Completion information rechecked 11 November 2026. Published developer or sales-partner target; confirm the selected property’s current contractual schedule with Grange.

Abu Dhabi / Hudayriyat Island
Wadeem Gardens
Target completion: Q2 2031
Indicative payment plan: 25/75 displayed on official factsheet; financing eligibility and detailed terms require confirmation Confirm current terms for the selected unit.
4 and 5 bedroom villas
View project detail
Price basis: developer-advertised starting price. Official price source.
Wadeem Gardens by Modon in Hudayriyat Island, Abu Dhabi.
Target completion: Q2 2031. Developer targets may change. Ask Grange to confirm current options and terms.
Official project information
Developer visualisations are indicative and do not show current construction or finished condition.
Developer completion reference · Checked 11 November 2026. Developer targets can change.

Dubai / Dubai Internet City
ICONIC Residences
Target completion: End 2027
Apartments; penthouse
View project detail
Price basis: developer-advertised starting price. Current availability and terms require confirmation.
ICONIC Residences by MERED in Dubai Internet City, Dubai.
Target completion: End 2027. Developer targets may change. Ask Grange to confirm current options and terms.
Official project information
Official pricing reference · Checked 18 October 2026.
Developer visualisations are indicative and do not show current construction or finished condition.
Developer completion reference · Checked 11 November 2026. Developer targets can change.

Abu Dhabi / Al Reem Island
Riviera Residences
Target completion: Phase 1 Q3 2029; Phase 2 Q2 2030
Indicative payment plan: 5% booking; 50% during construction including booking; 50% on completion Confirm current terms for the selected unit.
1–3 bedroom apartments; villas; duplexes; penthouse
View project detail
Riviera Residences by MERED in Al Reem Island, Abu Dhabi.
Target completion: Phase 1 Q3 2029; Phase 2 Q2 2030. Developer targets may change. Ask Grange to confirm current options and terms.
Official project information
Official pricing reference · Checked 18 October 2026.
Developer visualisations are indicative and do not show current construction or finished condition.
Developer completion reference · Checked 11 November 2026. Developer targets can change.

Dubai / Al Sufouh
Biltmore Residences
Original brochure handover target: Q4 2025; revised schedule to confirm
1 and 2 bedroom apartments shown on current developer page
View project detail
Biltmore Residences by GJ Properties in Al Sufouh, Dubai.
Original brochure handover target: Q4 2025; revised schedule to confirm. Developer targets may change. Ask Grange to confirm current options and terms.
Official project information
Official pricing reference · Checked 18 October 2026.
Developer visualisations are indicative and do not show current construction or finished condition.
Completion information rechecked 11 November 2026. The indexed project presentation contains a Q4 2025 launch handover target. That date has passed; later market schedules differ, so this is not a confirmed current delivery date.
Completion source

Dubai / Jumeirah Garden City
White Stone Residence
Target completion: June 2027
Apartments
View project detail
White Stone Residence by Axiom Prime in Jumeirah Garden City, Dubai.
Target completion: June 2027. Developer targets may change. Ask Grange to confirm current options and terms.
Official project information
Official pricing reference · Checked 18 October 2026.
Developer visualisations are indicative and do not show current construction or finished condition.
Developer completion reference · Checked 11 November 2026. Developer targets can change.

Dubai / Business Bay
Urban Life
Previously advertised handover: October 2026; current status to confirm
Studios; 1 and 2 bedroom apartments
View project detail
Urban Life by Urban Properties Development in Business Bay, Dubai.
Previously advertised handover: October 2026; current status to confirm. Developer targets may change. Ask Grange to confirm current options and terms.
Official project information
Official pricing reference · Checked 18 October 2026.
Developer visualisations are indicative and do not show current construction or finished condition.
Completion information rechecked 11 November 2026. Published developer or sales-partner target; confirm the selected property’s current contractual schedule with Grange.

Dubai / Wasl 1 / Al Kifaf
Avenue Park Towers II
Target handover: Q2 2030
1–3 bedroom apartments; 3–4 bedroom duplexes
View project detail
Avenue Park Towers II by Wasl in Wasl 1 / Al Kifaf, Dubai.
Target handover: Q2 2030. Developer targets may change. Ask Grange to confirm current options and terms.
Official project information
Official pricing reference · Checked 18 October 2026.
Developer visualisations are indicative and do not show current construction or finished condition.
Completion information rechecked 11 November 2026. Published developer or sales-partner target; confirm the selected property’s current contractual schedule with Grange.
Completion source

Dubai / Dubai Land Residence Complex
The Archive by Imtiaz
Target handover: Q3 2028
Apartments; mix available on request
View project detail
The Archive by Imtiaz by Imtiaz Developments in Dubai Land Residence Complex, Dubai.
Target handover: Q3 2028. Developer targets may change. Ask Grange to confirm current options and terms.
Official project information
Official pricing reference · Checked 18 October 2026.
Developer visualisations are indicative and do not show current construction or finished condition.
Completion information rechecked 11 November 2026. Published developer or sales-partner target; confirm the selected property’s current contractual schedule with Grange.
Completion source

Dubai / Meydan
Arthouse Residences Tower A
Project target: Q4 2027; confirm Tower A schedule
Indicative payment plan: 10% down payment; 10% in 30 days; four 7.5% instalments; 50% upon completion. Published schedule includes historic instalment dates, so obtain selected-unit schedule. Confirm current terms for the selected unit.
1BR; 1BR + study; 2BR; 2BR penthouse at project level
View project detail
Arthouse Residences Tower A by Aviaan in Meydan, Dubai.
Project target: Q4 2027; confirm Tower A schedule. Developer targets may change. Ask Grange to confirm current options and terms.
Official project information
Official pricing reference · Checked 18 October 2026.
Developer completion reference · Checked 11 November 2026. Developer targets can change.
Dubai / Palm Jebel Ali
Palm Jebel Ali – Frond F
Target completion: Q4 2028
Villas
View project detail
Palm Jebel Ali – Frond F by Nakheel in Palm Jebel Ali, Dubai.
Target completion: Q4 2028. Developer targets may change. Ask Grange to confirm current options and terms.
Official project information
Official pricing reference · Checked 18 October 2026.
Developer visualisations are indicative and do not show current construction or finished condition.
Developer completion reference · Checked 11 November 2026. Developer targets can change.

Dubai / Dubai Design District
The Edit at d3 – Tower C
Project target: June 2030; confirm Tower C schedule
Indicative payment plan: 20% booking; 55% staged instalments; 25% handover. Published November 2025 schedule includes historic due dates; selected-unit terms require confirmation. Confirm current terms for the selected unit.
Apartments; Tower C mix available on request
View project detail
The Edit at d3 – Tower C by Meraas / Dubai Holding Real Estate in Dubai Design District, Dubai.
Project target: June 2030; confirm Tower C schedule. Developer targets may change. Ask Grange to confirm current options and terms.
Official project information
Developer completion reference · Checked 11 November 2026. Developer targets can change.

Dubai / Wasl Gate / Jebel Ali
Boulevard Living
Completion date: awaiting developer confirmation
Apartments
View project detail
Boulevard Living by Wasl in Wasl Gate / Jebel Ali, Dubai.
Completion date: awaiting developer confirmation. Developer targets may change. Ask Grange to confirm current options and terms.
Official project information
Official pricing reference · Checked 18 October 2026.
Developer visualisations are indicative and do not show current construction or finished condition.
Developer completion reference · Checked 11 November 2026. Developer targets can change.
.jpg.jpeg)
Dubai / Dubai Islands
AQUORA
Target handover: Q1 2028
Indicative payment plan: 50% during construction; 50% handover Confirm current terms for the selected unit.
Residential apartments; mix available on request
View project detail
Price basis: project-wide starting price in the developer factsheet. Current availability and terms require confirmation.
AQUORA by Casa Vista Development LLC in Dubai Islands, Dubai.
Target handover: Q1 2028. Developer targets may change. Ask Grange to confirm current options and terms.
Official project information
Official pricing reference · Checked 18 October 2026.
Developer visualisations are indicative and do not show current construction or finished condition.
Completion information rechecked 11 November 2026. Published developer or sales-partner target; confirm the selected property’s current contractual schedule with Grange.
Completion source

Ras Al Khaimah / Al Marjan Island
Miraggio
Target handover: Q4 2028
Indicative payment plan: 5% booking; 5% SPA; 5% within 3 months; 5% within 6 months; 40% completion; 40% over 2 years post-handover Confirm current terms for the selected unit.
Apartments; ask for current layouts
View project detail
Miraggio by Source of Fate in Al Marjan Island, Ras Al Khaimah.
Target handover: Q4 2028. Developer targets may change. Ask Grange to confirm current options and terms.
Official project information
Official pricing reference · Checked 18 October 2026.
Developer visualisations are indicative and do not show current construction or finished condition.
Completion information rechecked 11 November 2026. Published developer or sales-partner target; confirm the selected property’s current contractual schedule with Grange.
Completion source

Dubai / Dubai Islands
241 Waterside
Target completion: Q1 2028
Indicative payment plan: 10% booking; 10% signing SPA; 25% during construction; 55% handover Confirm current terms for the selected unit.
Sky lofts; 2 and 3 bedroom residences; penthouse
View project detail
241 Waterside by Regent Developments in Dubai Islands, Dubai.
Target completion: Q1 2028. Developer targets may change. Ask Grange to confirm current options and terms.
Official project information
Developer visualisations are indicative and do not show current construction or finished condition.
Developer completion reference · Checked 11 November 2026. Developer targets can change.

Dubai / Sheikh Zayed Road
Sobha Central – The Horizon
Target completion: December 2029
1 and 2 bedroom apartments
View project detail
Price basis: developer-advertised starting price. Official price source.
Sobha Central – The Horizon by Sobha Realty in Sheikh Zayed Road, Dubai.
Target completion: December 2029. Developer targets may change. Ask Grange to confirm current options and terms.
Official project information
Developer visualisations are indicative and do not show current construction or finished condition.
Developer completion reference · Checked 11 November 2026. Developer targets can change.

Dubai / Sheikh Zayed Road
Sobha Central – The Eden
Target completion: December 2029
1 and 2 bedroom apartments
View project detail
Price basis: developer-advertised starting price. Official price source.
Sobha Central – The Eden by Sobha Realty in Sheikh Zayed Road, Dubai.
Target completion: December 2029. Developer targets may change. Ask Grange to confirm current options and terms.
Official project information
Developer visualisations are indicative and do not show current construction or finished condition.
Developer completion reference · Checked 11 November 2026. Developer targets can change.

Dubai / Sheikh Zayed Road
Sobha Central – The Serene
Target completion: December 2029
1 and 2 bedroom apartments
View project detail
Price basis: developer-advertised starting price. Official price source.
Sobha Central – The Serene by Sobha Realty in Sheikh Zayed Road, Dubai.
Target completion: December 2029. Developer targets may change. Ask Grange to confirm current options and terms.
Official project information
Developer visualisations are indicative and do not show current construction or finished condition.
Developer completion reference · Checked 11 November 2026. Developer targets can change.

Dubai / Sheikh Zayed Road
Sobha Central – The Tranquil
Target completion: December 2029
1 and 2 bedroom apartments
View project detail
Price basis: developer-advertised starting price. Official price source.
Sobha Central – The Tranquil by Sobha Realty in Sheikh Zayed Road, Dubai.
Target completion: December 2029. Developer targets may change. Ask Grange to confirm current options and terms.
Official project information
Developer visualisations are indicative and do not show current construction or finished condition.
Developer completion reference · Checked 11 November 2026. Developer targets can change.

Dubai / Sheikh Zayed Road
Sobha Central – The Pinnacle
Target completion: December 2030
1 and 2 bedroom apartments
View project detail
Price basis: developer-advertised starting price. Official price source.
Sobha Central – The Pinnacle by Sobha Realty in Sheikh Zayed Road, Dubai.
Target completion: December 2030. Developer targets may change. Ask Grange to confirm current options and terms.
Official project information
Developer visualisations are indicative and do not show current construction or finished condition.
Developer completion reference · Checked 11 November 2026. Developer targets can change.

Dubai / Sheikh Zayed Road
Sold out
Sobha Central – The Mirage
Target completion: December 2030
Apartments; mix available on request
Listed as sold out by Sobha Realty. Checked 18 October 2026.
View project detail
Sobha Central – The Mirage by Sobha Realty in Sheikh Zayed Road, Dubai.
Target completion: December 2030. Developer targets may change. The developer lists this project as sold out. Ask Grange about similar projects.
Official project information
Developer visualisations are indicative and do not show current construction or finished condition.
Developer completion reference · Checked 11 November 2026. Developer targets can change.
Dubai / Dubai; ask for exact location
Sobha Skyparks
Target completion: 2031
Residential; detailed mix available on request
View project detail
Sobha Skyparks by Sobha Realty in Dubai; ask for exact location, Dubai.
Target completion: 2031. Developer targets may change. Ask Grange to confirm current options and terms.
Official project information
Official pricing reference · Checked 18 October 2026.
Developer visualisations are indicative and do not show current construction or finished condition.
Developer completion reference · Checked 11 November 2026. Developer targets can change.

Dubai / Business Bay
Binghatti Skyrise
Developer dates differ: Q4 2026 / March 2027; confirmation required
Studios; 1–3 bedroom apartments
View project detail
Price basis: developer-advertised starting price. Official price source.
Binghatti Skyrise by Binghatti in Business Bay, Dubai.
Developer dates differ: Q4 2026 / March 2027; confirmation required. Developer targets may change. Ask Grange to confirm current options and terms.
Official project information
Developer visualisations are indicative and do not show current construction or finished condition.
Developer completion reference · Checked 11 November 2026. Developer targets can change.

Dubai / Uptown Dubai
Mercer House
Target completion: Q3 2027
Studios; 1–3 bedroom apartments; 4BR penthouses
View project detail
Price basis: developer-advertised starting price. Official price source.
Mercer House by Ellington Properties in Uptown Dubai, Dubai.
Target completion: Q3 2027. Developer targets may change. Ask Grange to confirm current options and terms.
Official project information
Developer visualisations are indicative and do not show current construction or finished condition.
Developer completion reference · Checked 11 November 2026. Developer targets can change.

Dubai / Dubai Hills Estate
Ellington House II
Handover commenced: May 2026
Residences; detailed mix available on request
View project detail
Ellington House II by Ellington Properties in Dubai Hills Estate, Dubai.
Handover status: Handover commenced May 2026. Developer targets may change. Ask Grange to confirm current options and terms.
Official project information
Official pricing reference · Checked 18 October 2026.
Developer visualisations are indicative and do not show current construction or finished condition.
Developer completion reference · Checked 11 November 2026. Developer targets can change.

Dubai / Arjan
Arbor View
Handover commenced: May 2026
Residences; detailed mix available on request
View project detail
Arbor View by Ellington Properties in Arjan, Dubai.
Handover status: Handover commenced May 2026. Developer targets may change. Ask Grange to confirm current options and terms.
Official project information
Official pricing reference · Checked 18 October 2026.
Developer visualisations are indicative and do not show current construction or finished condition.
Developer completion reference · Checked 11 November 2026. Developer targets can change.

Dubai / Business Bay
Avarra by Palace
Unit-schedule target: June 2031
1–4BR apartments; 6BR penthouse
View project detail
Avarra by Palace by Emaar in Business Bay, Dubai.
Unit-schedule target: June 2031. Developer targets may change. Ask Grange to confirm current options and terms.
Official project information
Developer visualisations are indicative and do not show current construction or finished condition.
Completion information rechecked 11 November 2026. Based on the developer’s public unit payment schedule for BBP Avarra by Palace-74-7405. Dates and terms can differ by unit, building or phase; confirm the selected home’s contractual schedule with Grange.

Dubai / Dubai Hills Estate
Hillsedge
Unit-schedule target: January 2029
1 and 2 bedroom apartments
View project detail
Hillsedge by Emaar in Dubai Hills Estate, Dubai.
Unit-schedule target: January 2029. Developer targets may change. Ask Grange to confirm current options and terms.
Official project information
Developer visualisations are indicative and do not show current construction or finished condition.
Completion information rechecked 11 November 2026. Based on the developer’s public unit payment schedule for DE Hillsedge B-5-505. Dates and terms can differ by unit, building or phase; confirm the selected home’s contractual schedule with Grange.

Dubai / Dubai Creek Harbour
Albero
Unit-schedule target: September 2029
1–3BR apartments; 3BR townhouses
View project detail
Albero by Emaar in Dubai Creek Harbour, Dubai.
Unit-schedule target: September 2029. Developer targets may change. Ask Grange to confirm current options and terms.
Official project information
Developer visualisations are indicative and do not show current construction or finished condition.
Completion information rechecked 11 November 2026. Based on the developer’s public unit payment schedule for DC Albero-3-306. Dates and terms can differ by unit, building or phase; confirm the selected home’s contractual schedule with Grange.

Dubai / Dubai Creek Harbour
Valia
Developer target: December 2030
1–4 bedroom apartments
View project detail
Price basis: developer-advertised starting price. Official price source.
Valia by Emaar in Dubai Creek Harbour, Dubai.
Developer target: December 2030. Developer targets may change. Ask Grange to confirm current options and terms.
Official project information
Unit mix checked against Emaar’s official key facts on 18 October 2026. The published mix is 1–4 bedroom apartments.
Developer visualisations are indicative and do not show current construction or finished condition.
Completion information rechecked 11 November 2026. Published developer or sales-partner target; confirm the selected property’s current contractual schedule with Grange.
Completion source

Dubai / The Heights Country Club and Wellness
Salva
Unit-schedule target: July 2030
3–5 bedroom villas
View project detail
A villa collection by Emaar at The Heights Country Club and Wellness, with wellness spaces, landscaped gardens and lakeside promenades.
Unit-schedule target: July 2030. Developer targets may change. Ask Grange to confirm current options and terms.
Official project information
Developer information checked 18 October 2026. The sourced price basis is labelled above. Current availability requires confirmation.
Developer visualisations are indicative and do not show current construction or finished condition.
Completion information rechecked 11 November 2026. Based on the developer’s public unit payment schedule for TH Salva-V-78. Dates and terms can differ by unit, building or phase; confirm the selected home’s contractual schedule with Grange.

Dubai / Rashid Yachts & Marina
Fior 1
Developer target: July 2030
1–3 bedroom apartments
View project detail
Price basis: developer-advertised starting price. Official price source.
Apartments by Emaar at Rashid Yachts & Marina, with an infinity pool, gym, landscaped gardens and children’s play areas.
Developer target: July 2030. Developer targets may change. Ask Grange to confirm current options and terms.
Official project information
Developer information checked 18 October 2026. The sourced price basis is labelled above. Current availability requires confirmation.
Developer visualisations are indicative and do not show current construction or finished condition.
Completion information rechecked 11 November 2026. Published developer or sales-partner target; confirm the selected property’s current contractual schedule with Grange.
Completion source

Dubai / Dubai Hills Estate
Greencrest
Unit-schedule target: June 2029
1–3 bedroom apartments
View project detail
A golf-course setting at Dubai Hills Estate, with one-, two- and three-bedroom apartments by Emaar.
Unit-schedule target: June 2029. Developer targets may change. Ask Grange to confirm current options and terms.
Official project information
Developer information checked 18 October 2026. The sourced price basis is labelled above. Current availability requires confirmation.
Developer visualisations are indicative and do not show current construction or finished condition.
Completion information rechecked 11 November 2026. Based on the developer’s public unit payment schedule for DE Greencrest Tower-8-802. Dates and terms can differ by unit, building or phase; confirm the selected home’s contractual schedule with Grange.

Dubai / Dubai Creek Harbour
Creek Bay
Unit-schedule target: April 2030
1–3 bedroom apartments
View project detail
Apartments by Emaar in Dubai Creek Harbour, with an infinity pool, fitness spaces and outdoor areas for families.
Unit-schedule target: April 2030. Developer targets may change. Ask Grange to confirm current options and terms.
Official project information
Developer information checked 18 October 2026. The sourced price basis is labelled above. Current availability requires confirmation.
Developer visualisations are indicative and do not show current construction or finished condition.
Completion information rechecked 11 November 2026. Based on the developer’s public unit payment schedule for DC Creek Bay Podium-G-G05. Dates and terms can differ by unit, building or phase; confirm the selected home’s contractual schedule with Grange.

Dubai / Rashid Yachts & Marina
Baystar by Vida
Unit-schedule target: December 2029
1–3 bedroom apartments; 4-bedroom homes
View project detail
Vida-branded residences by Emaar at Rashid Yachts & Marina, with an infinity pool, gym, landscaped gardens and children’s play areas.
Unit-schedule target: December 2029. Developer targets may change. Ask Grange to confirm current options and terms.
Official project information
Developer information checked 18 October 2026. The sourced price basis is labelled above. Current availability requires confirmation.
Developer visualisations are indicative and do not show current construction or finished condition.
Completion information rechecked 11 November 2026. Based on the developer’s public unit payment schedule for RY Baystar by Vida T2-P-P02. Dates and terms can differ by unit, building or phase; confirm the selected home’s contractual schedule with Grange.

Dubai / Dubai Maritime City
Chelsea Residences by DAMAC
Original launch phase target completion: December 2029; confirm tower/release
Residential apartments; bedroom mix available on request
View project detail
Price basis: developer-advertised starting price. Official price source.
Chelsea FC’s 30 April 2025 announcement confirms the launch and Dubai Maritime City location. The current phase, construction status and bedroom mix are not established by the accepted source.
Original launch phase target completion: December 2029; confirm tower/release. Current payment terms and availability require confirmation.
Official partner announcement
Official project source checked 18 October 2026.
Bedroom range requires confirmation against current developer information.
Developer visualisations are indicative and do not show current construction or finished condition.
Completion information rechecked 11 November 2026. Published developer or sales-partner target; confirm the selected property’s current contractual schedule with Grange.
Completion source

Dubai / Ask for exact location
DAMAC Islands 2
Published unit-schedule target completion: June 2030; confirm phase and unit
6-bedroom villas; 5-bedroom twin villas; 4–5 bedroom townhouses
View project detail
Price basis: developer-advertised starting price. Official price source.
DAMAC’s original November 2025 brochure confirms this unit mix on physical pages 73,75 and 77–79. The exact Dubai district, current release and construction status remain unverified.
Published unit-schedule target completion: June 2030; confirm phase and unit. Current payment terms and availability require confirmation.
Developer source
Official project source checked 18 October 2026.
The unit mix follows the original developer brochure; the district requires confirmation.
Developer visualisations are indicative and do not show current construction or finished condition.
Completion information rechecked 11 November 2026. Published developer or sales-partner target; confirm the selected property’s current contractual schedule with Grange.

Dubai / Business Bay
Altitude de GRISOGONO
Completion date: awaiting developer confirmation
Studios; 1–3 bedroom apartments; 2-bedroom duplex layouts
View project detail
Price basis: developer-advertised starting price. Official price source.
DAMAC’s original January 2024 Chinese-edition brochure confirms Business Bay and studios/1–3 bedroom apartments, including 2-bedroom duplex layouts on pages 53–54. Current construction and release status are unverified.
Completion date: awaiting developer confirmation. Current payment terms and availability require confirmation.
Developer source
Official project source checked 18 October 2026.
Project information follows the original developer brochure.
Developer visualisations are indicative and do not show current construction or finished condition.
Developer completion reference · Checked 11 November 2026. Developer targets can change.

Dubai / Emaar South
Golf Trails
Unit-schedule target: October 2030
1–3 bedroom apartments; 3-bedroom townhouses
View project detail
Golf Trails by Emaar in Emaar South, Dubai.
Unit-schedule target: October 2030. Developer targets may change. Ask Grange to confirm current options and terms.
Official project information
Developer information checked 18 October 2026. The sourced price basis is labelled above. Current availability requires confirmation.
Developer visualisations are indicative and do not show current construction or finished condition.
Completion information rechecked 11 November 2026. Based on the developer’s public unit payment schedule for ES Golf Trails-5-508. Dates and terms can differ by unit, building or phase; confirm the selected home’s contractual schedule with Grange.

Dubai / Emaar South
Golf Fields
Developer target: September 2030
1–3 bedroom apartments; 3-bedroom townhouses
View project detail
Price basis: developer-advertised starting price. Official price source.
Golf Fields by Emaar in Emaar South, Dubai.
Developer target: September 2030. Developer targets may change. Ask Grange to confirm current options and terms.
Official project information
Developer information checked 18 October 2026. The sourced price basis is labelled above. Current availability requires confirmation.
Developer visualisations are indicative and do not show current construction or finished condition.
Completion information rechecked 11 November 2026. Published developer or sales-partner target; confirm the selected property’s current contractual schedule with Grange.
Completion source

Dubai / Emaar South
Golf Vale
Unit-schedule target: March 2030
1–3 bedroom apartments; 3-bedroom townhouses
View project detail
Golf Vale by Emaar in Emaar South, Dubai.
Unit-schedule target: March 2030. Developer targets may change. Ask Grange to confirm current options and terms.
Official project information
Developer information checked 18 October 2026. The sourced price basis is labelled above. Current availability requires confirmation.
Developer visualisations are indicative and do not show current construction or finished condition.
Completion information rechecked 11 November 2026. Based on the developer’s public unit payment schedule for ES Golf Vale-7-704. Dates and terms can differ by unit, building or phase; confirm the selected home’s contractual schedule with Grange.

Dubai / Expo Living
Terra Woods
Unit-schedule target: March 2030
1–3 bedroom apartments; townhouses (townhouse bedroom mix available on request)
View project detail
Terra Woods by Emaar in Expo Living, Dubai.
Unit-schedule target: March 2030. Developer targets may change. Ask Grange to confirm current options and terms.
Official project information
Developer information checked 18 October 2026. The sourced price basis is labelled above. Current availability requires confirmation.
Developer visualisations are indicative and do not show current construction or finished condition.
Completion information rechecked 11 November 2026. Based on the developer’s public unit payment schedule for EX Terra Woods TH-G-TH06. Dates and terms can differ by unit, building or phase; confirm the selected home’s contractual schedule with Grange.

Dubai / The Heights Country Club and Wellness
Serro 2
Developer target: May 2030
3–5 bedroom villas
View project detail
Price basis: developer-advertised starting price. Official price source.
Serro 2 by Emaar in The Heights Country Club and Wellness, Dubai.
Developer target: May 2030. Developer targets may change. Ask Grange to confirm current options and terms.
Official project information
Developer information checked 18 October 2026. The sourced price basis is labelled above. Current availability requires confirmation.
Developer visualisations are indicative and do not show current construction or finished condition.
Completion information rechecked 11 November 2026. Published developer or sales-partner target; confirm the selected property’s current contractual schedule with Grange.
Completion source

Dubai / Emaar South
Vista Ridge
Unit-schedule target: September 2029
1–3 bedroom apartments; 3-bedroom townhouses
View project detail
Vista Ridge by Emaar in Emaar South, Dubai.
Unit-schedule target: September 2029. Developer targets may change. Ask Grange to confirm current options and terms.
Official project information
Developer information checked 18 October 2026. The sourced price basis is labelled above. Current availability requires confirmation.
Developer visualisations are indicative and do not show current construction or finished condition.
Completion information rechecked 11 November 2026. Based on the developer’s public unit payment schedule for ES Vista Ridge T2-4-408. Dates and terms can differ by unit, building or phase; confirm the selected home’s contractual schedule with Grange.

Dubai / Emaar South
Grove Ridge
Unit-schedule target: September 2029
1–3 bedroom apartments; 3-bedroom townhouses
View project detail
Grove Ridge by Emaar in Emaar South, Dubai.
Unit-schedule target: September 2029. Developer targets may change. Ask Grange to confirm current options and terms.
Official project information
Developer information checked 18 October 2026. The sourced price basis is labelled above. Current availability requires confirmation.
Developer visualisations are indicative and do not show current construction or finished condition.
Completion information rechecked 11 November 2026. Based on the developer’s public unit payment schedule for ES Grove Ridge T1-10-1007. Dates and terms can differ by unit, building or phase; confirm the selected home’s contractual schedule with Grange.

Dubai / Dubai Creek Harbour
Creek Haven
Unit-schedule target: March 2030
1–3 bedroom apartments
View project detail
Creek Haven by Emaar in Dubai Creek Harbour, Dubai.
Unit-schedule target: March 2030. Developer targets may change. Ask Grange to confirm current options and terms.
Official project information
Developer information checked 18 October 2026. The sourced price basis is labelled above. Current availability requires confirmation.
Developer visualisations are indicative and do not show current construction or finished condition.
Completion information rechecked 11 November 2026. Based on the developer’s public unit payment schedule for DC Creek Haven A-4-404. Dates and terms can differ by unit, building or phase; confirm the selected home’s contractual schedule with Grange.

Dubai / The Heights Country Club and Wellness
Serro
Developer target: March 2030
3–5 bedroom villas
View project detail
Price basis: developer-advertised starting price. Official price source.
Serro by Emaar in The Heights Country Club and Wellness, Dubai.
Developer target: March 2030. Developer targets may change. Ask Grange to confirm current options and terms.
Official project information
Developer information checked 18 October 2026. The sourced price basis is labelled above. Current availability requires confirmation.
Developer visualisations are indicative and do not show current construction or finished condition.
Completion information rechecked 11 November 2026. Published developer or sales-partner target; confirm the selected property’s current contractual schedule with Grange.
Completion source

Dubai / Dubai Creek Harbour
Altus
Unit-schedule target: January 2028; published catalogue: Q4 2028; confirm chosen unit
1–3 bedroom apartments
View project detail
Altus by Emaar in Dubai Creek Harbour, Dubai.
Unit-schedule target: January 2028; published catalogue: Q4 2028; confirm chosen unit. The project landing page does not state a handover date. Construction status and schedule have not been independently confirmed; developer targets may change.
Official project information · Expected-handover source
The sourced price basis is labelled above. Current availability requires confirmation.
Developer visualisations are indicative and do not show current construction or finished condition.
Completion information rechecked 11 November 2026. Based on the developer’s public unit payment schedule for DC Altus T1-P2-P203. Dates and terms can differ by unit, building or phase; confirm the selected home’s contractual schedule with Grange.

Dubai / Dubai Creek Harbour
Creek Waters 2
Unit-schedule target: December 2027; published catalogue: Q3 2027; confirm chosen unit
1–4 bedroom apartments; 3-bedroom townhouses; 5-bedroom duplex penthouses
View project detail
Creek Waters 2 by Emaar in Dubai Creek Harbour, Dubai.
Unit-schedule target: December 2027; published catalogue: Q3 2027; confirm chosen unit. The project landing page does not state a handover date. Construction status and schedule have not been independently confirmed; developer targets may change.
Official project information · Expected-handover source
The sourced price basis is labelled above. Current availability requires confirmation.
Developer visualisations are indicative and do not show current construction or finished condition.
Completion information rechecked 11 November 2026. Based on the developer’s public unit payment schedule for DC Creek Waters 2-B2-B203. Dates and terms can differ by unit, building or phase; confirm the selected home’s contractual schedule with Grange.

Dubai / Emaar South
Golf Meadow
Unit-schedule target: July 2029
1–3 bedroom apartments; 3-bedroom townhouses
View project detail
Golf Meadow by Emaar in Emaar South, Dubai.
Unit-schedule target: July 2029. The project landing page does not state a handover date. Construction status and schedule have not been independently confirmed; developer targets may change.
Official project information · Expected-handover source
The sourced price basis is labelled above. Current availability requires confirmation.
Developer visualisations are indicative and do not show current construction or finished condition.
Completion information rechecked 11 November 2026. Based on the developer’s public unit payment schedule for ES Golf Meadow-G-TH01. Dates and terms can differ by unit, building or phase; confirm the selected home’s contractual schedule with Grange.

Dubai / Emaar South
Golf Point
Unit-schedule target: October 2028; published catalogue: Q1 2029; confirm chosen unit
1–3 bedroom apartments
View project detail
Golf Point by Emaar in Emaar South, Dubai.
Unit-schedule target: October 2028; published catalogue: Q1 2029; confirm chosen unit. The project landing page does not state a handover date. Construction status and schedule have not been independently confirmed; developer targets may change.
Official project information · Expected-handover source
The sourced price basis is labelled above. Current availability requires confirmation.
Developer visualisations are indicative and do not show current construction or finished condition.
Completion information rechecked 11 November 2026. Based on the developer’s public unit payment schedule for ES Golf Point 1-P-P18. Dates and terms can differ by unit, building or phase; confirm the selected home’s contractual schedule with Grange.

Dubai / Rashid Yachts & Marina
Seascape
Developer target: November 2026
1–3 bedrooms; complete property-type mix available on request
View project detail
Seascape by Emaar in Rashid Yachts & Marina, Dubai.
Developer target: November 2026. The project landing page does not state a handover date. Construction status and schedule have not been independently confirmed; developer targets may change.
Official project information · Expected-handover source
The sourced price basis is labelled above. Current availability requires confirmation.
Developer visualisations are indicative and do not show current construction or finished condition.
Completion information rechecked 11 November 2026. Published developer or sales-partner target; confirm the selected property’s current contractual schedule with Grange.
Completion source

Dubai / Dubai Creek Harbour
Altan
Unit-schedule target: July 2029
1 to 3-bedroom apartments; 3 bedroom townhouses
View project detail
Altan by Emaar in Dubai Creek Harbour, Dubai.
Emaar’s H1 2026 investor presentation reports this project under development as of 30 June 2026. It remains in the current official catalogue checked 18 October 2026. Status after the report date is not independently verified. Ask Grange for the latest handover schedule.
Official project information · Dated launch evidence
The sourced price basis is labelled above. Current availability requires confirmation.
Dated development evidence
Developer visualisations are indicative and do not show current construction or finished condition.
Completion information rechecked 11 November 2026. Based on the developer’s public unit payment schedule for DC Altan-P3-P303. Dates and terms can differ by unit, building or phase; confirm the selected home’s contractual schedule with Grange.

Dubai / Dubai Creek Harbour
Silva
Unit-schedule target: September 2029
1 to 3 Bed Apartments & 3 Bed Townhouse
View project detail
Silva by Emaar in Dubai Creek Harbour, Dubai.
Emaar’s H1 2026 investor presentation reports this project under development as of 30 June 2026. It remains in the current official catalogue checked 18 October 2026. Status after the report date is not independently verified. Ask Grange for the latest handover schedule.
Official project information · Dated launch evidence
The sourced price basis is labelled above. Current availability requires confirmation.
Dated development evidence
Developer visualisations are indicative and do not show current construction or finished condition.
Completion information rechecked 11 November 2026. Based on the developer’s public unit payment schedule for DC Silva-1-103. Dates and terms can differ by unit, building or phase; confirm the selected home’s contractual schedule with Grange.

Dubai / Dubai Hills Estate
Parkwood
Unit-schedule target: January 2029
1, 2 & 3 Bed Units and 3 Bed Townhouses
View project detail
Parkwood by Emaar in Dubai Hills Estate, Dubai.
Emaar’s H1 2026 investor presentation reports this project under development as of 30 June 2026. It remains in the current official catalogue checked 18 October 2026. Status after the report date is not independently verified. Ask Grange for the latest handover schedule.
Official project information · Dated launch evidence
The sourced price basis is labelled above. Current availability requires confirmation.
Dated development evidence
Developer visualisations are indicative and do not show current construction or finished condition.
Completion information rechecked 11 November 2026. Based on the developer’s public unit payment schedule for DE Parkwood B-1-108. Dates and terms can differ by unit, building or phase; confirm the selected home’s contractual schedule with Grange.

Dubai / Dubai Hills Estate
Rosehill
Unit-schedule target: June 2029
1, 2 and 3 bedroom apartments
View project detail
Rosehill by Emaar in Dubai Hills Estate, Dubai.
Emaar’s H1 2026 investor presentation reports this project under development as of 30 June 2026. It remains in the current official catalogue checked 18 October 2026. Status after the report date is not independently verified. Ask Grange for the latest handover schedule.
Official project information · Dated launch evidence
The sourced price basis is labelled above. Current availability requires confirmation.
Dated development evidence
Developer visualisations are indicative and do not show current construction or finished condition.
Completion information rechecked 11 November 2026. Based on the developer’s public unit payment schedule for DE Rosehill B-G-G05. Dates and terms can differ by unit, building or phase; confirm the selected home’s contractual schedule with Grange.

Dubai / Emaar South
Golf Verge
Unit-schedule target: May 2029
1-3 bedroom apartments
View project detail
Golf Verge by Emaar in Emaar South, Dubai.
Emaar’s H1 2026 investor presentation reports this project under development as of 30 June 2026. It remains in the current official catalogue checked 18 October 2026. Status after the report date is not independently verified. Ask Grange for the latest handover schedule.
Official project information · Dated launch evidence
The sourced price basis is labelled above. Current availability requires confirmation.
Dated development evidence
Developer visualisations are indicative and do not show current construction or finished condition.
Completion information rechecked 11 November 2026. Based on the developer’s public unit payment schedule for ES Golf Verge B-1-106. Dates and terms can differ by unit, building or phase; confirm the selected home’s contractual schedule with Grange.

Dubai / Expo Living
Terra Gardens
Unit-schedule target: October 2029
1–3 bedroom apartments; 3 Bedroom Townhouses
View project detail
Terra Gardens by Emaar in Expo Living, Dubai.
Emaar’s H1 2026 investor presentation reports this project under development as of 30 June 2026. It remains in the current official catalogue checked 18 October 2026. Status after the report date is not independently verified. Ask Grange for the latest handover schedule.
Official project information · Dated launch evidence
The sourced price basis is labelled above. Current availability requires confirmation.
Dated development evidence
Developer visualisations are indicative and do not show current construction or finished condition.
Completion information rechecked 11 November 2026. Based on the developer’s public unit payment schedule for EX Terra Gardens Building 2-5-520. Dates and terms can differ by unit, building or phase; confirm the selected home’s contractual schedule with Grange.

Dubai / Rashid Yachts & Marina
Aurea
Unit-schedule target: June 2030
1, 2, and 3-bedroom apartments
View project detail
Aurea by Emaar in Rashid Yachts & Marina, Dubai.
Emaar’s H1 2026 investor presentation reports this project under development as of 30 June 2026. It remains in the current official catalogue checked 18 October 2026. Status after the report date is not independently verified. Ask Grange for the latest handover schedule.
Official project information · Dated launch evidence
The sourced price basis is labelled above. Current availability requires confirmation.
Dated development evidence
Developer visualisations are indicative and do not show current construction or finished condition.
Completion information rechecked 11 November 2026. Based on the developer’s public unit payment schedule for RY Aurea-1-108. Dates and terms can differ by unit, building or phase; confirm the selected home’s contractual schedule with Grange.

Dubai / The Valley
Ovelle
Unit-schedule target: December 2029
4 & 5 bedroom villas
View project detail
Ovelle by Emaar in The Valley, Dubai.
Emaar’s H1 2026 investor presentation reports this project under development as of 30 June 2026. It remains in the current official catalogue checked 18 October 2026. Status after the report date is not independently verified. Ask Grange for the latest handover schedule.
Official project information · Dated launch evidence
The sourced price basis is labelled above. Current availability requires confirmation.
Dated development evidence
Developer visualisations are indicative and do not show current construction or finished condition.
Completion information rechecked 11 November 2026. Based on the developer’s public unit payment schedule for TV Ovelle-V-74. Dates and terms can differ by unit, building or phase; confirm the selected home’s contractual schedule with Grange.

Dubai / Dubai Hills Estate
Palace Residences Hillside
Unit-schedule target: June 2029
1, 2, 3 Bedroom Apartments; 3 Bedroom Townhouses
View project detail
Palace Residences Hillside by Emaar in Dubai Hills Estate, Dubai.
Emaar’s H1 2026 investor presentation reports this project under development as of 30 June 2026. It remains in the current official catalogue checked 18 October 2026. Status after the report date is not independently verified. Ask Grange for the latest handover schedule.
Official project information · Dated launch evidence
The sourced price basis is labelled above. Current availability requires confirmation.
Dated development evidence
Developer visualisations are indicative and do not show current construction or finished condition.
Completion information rechecked 11 November 2026. Based on the developer’s public unit payment schedule for DE Palace Hillside A-G-TH01. Dates and terms can differ by unit, building or phase; confirm the selected home’s contractual schedule with Grange.

Dubai / Dubai Creek Harbour
Montiva by Vida
Unit-schedule target: September 2029
1 to 3-bedroom apartments
View project detail
Montiva by Vida by Emaar in Dubai Creek Harbour, Dubai.
Emaar’s H1 2026 investor presentation reports this project under development as of 30 June 2026. It remains in the current official catalogue checked 18 October 2026. Status after the report date is not independently verified. Ask Grange for the latest handover schedule.
Official project information · Dated launch evidence
The sourced price basis is labelled above. Current availability requires confirmation.
Dated development evidence
Developer visualisations are indicative and do not show current construction or finished condition.
Completion information rechecked 11 November 2026. Based on the developer’s public unit payment schedule for DC Montiva-P2-P206. Dates and terms can differ by unit, building or phase; confirm the selected home’s contractual schedule with Grange.

Dubai / Dubai Creek Harbour
Lyvia by Palace
Unit-schedule target: July 2029
1, 2, 3 Bedroom Apartments; 3 Bedroom Townhouses
View project detail
Lyvia by Palace by Emaar in Dubai Creek Harbour, Dubai.
Emaar’s H1 2026 investor presentation reports this project under development as of 30 June 2026. It remains in the current official catalogue checked 18 October 2026. Status after the report date is not independently verified. Ask Grange for the latest handover schedule.
Official project information · Dated launch evidence
The sourced price basis is labelled above. Current availability requires confirmation.
Dated development evidence
Developer visualisations are indicative and do not show current construction or finished condition.
Completion information rechecked 11 November 2026. Based on the developer’s public unit payment schedule for DC Lyvia-4-408. Dates and terms can differ by unit, building or phase; confirm the selected home’s contractual schedule with Grange.

Dubai / Dubai Hills Estate
Vida Residences Hillside
Unit-schedule target: May 2029
1 to 3-bedroom apartments; 3 bedroom townhouses
View project detail
Vida Residences Hillside by Emaar in Dubai Hills Estate, Dubai.
Emaar’s H1 2026 investor presentation reports this project under development as of 30 June 2026. It remains in the current official catalogue checked 18 October 2026. Status after the report date is not independently verified. Ask Grange for the latest handover schedule.
Official project information · Dated launch evidence
The sourced price basis is labelled above. Current availability requires confirmation.
Dated development evidence
Developer visualisations are indicative and do not show current construction or finished condition.
Completion information rechecked 11 November 2026. Based on the developer’s public unit payment schedule for DE Vida Hillside A-1-101. Dates and terms can differ by unit, building or phase; confirm the selected home’s contractual schedule with Grange.

Dubai / DAMAC Riverside
Riverside Views
Royal 1 B target completion: March 2029; confirm building and unit
1–2 bedroom apartments
View project detail
Price basis: developer-advertised starting price. Official price source.
DAMAC’s issuer-published announcement dated 29 January 2025 confirms Riverside Views as its first launch of 2025, with 1–2 bedroom apartments in DAMAC Riverside. Current construction and release status remain unverified.
Royal 1 B target completion: March 2029; confirm building and unit. Current payment terms and availability require confirmation.
Developer source
Official project source checked 18 October 2026.
Developer visualisations are indicative and do not show current construction or finished condition.
Completion information rechecked 11 November 2026. Published developer or sales-partner target; confirm the selected property’s current contractual schedule with Grange.

Dubai / Dubailand
DAMAC Islands
Maldives 4 target completion: December 2028; confirm phase and unit
4–5 bedroom townhouses; 6–7 bedroom villas
View project detail
Price basis: developer-advertised starting price. Official price source.
DAMAC’s 20 November 2024 launch announcement and original December 2024 brochure support this Dubai community and unit mix. Current construction, phase and availability remain unverified.
Maldives 4 target completion: December 2028; confirm phase and unit. Current payment terms and availability require confirmation.
Developer source · Developer source
Official project source checked 18 October 2026.
Developer visualisations are indicative and do not show current construction or finished condition.
Completion information rechecked 11 November 2026. Published developer or sales-partner target; confirm the selected property’s current contractual schedule with Grange.

Dubai / DAMAC Lagoons District
Valencia
Tower A unit target completion: March 2029; confirm tower and unit
Studios; 1–2 bedroom apartments
View project detail
Price basis: developer-advertised starting price. Official price source.
DAMAC’s original Lagoons District concept brochure identifies Valencia and this apartment mix on page 24, with floorplans on pages 29–30. Its PDF creation metadata is January 2026, which is not independent proof of publication date. Current construction and release status remain unverified.
Tower A unit target completion: March 2029; confirm tower and unit. Current payment terms and availability require confirmation.
Developer source
Official project source checked 18 October 2026.
Completion information rechecked 11 November 2026. Published developer or sales-partner target; confirm the selected property’s current contractual schedule with Grange.

Dubai / Dubai Creek Harbour
Aeon
Unit-schedule target: September 2027
1,2 & 3-Bedroom Apartments
View project detail
Aeon by Emaar in Dubai Creek Harbour, Dubai.
Emaar’s H1 2026 investor presentation reports this project under development as of 30 June 2026. It remains in the current official catalogue checked 18 October 2026. Status after the report date is not independently verified. Ask Grange for the latest handover schedule.
Official project information · Dated development evidence
The sourced price basis is labelled above. Current availability requires confirmation.
Developer visualisations are indicative and do not show current construction or finished condition.
Completion information rechecked 11 November 2026. Based on the developer’s public unit payment schedule for DC Aeon T2-P-P07. Dates and terms can differ by unit, building or phase; confirm the selected home’s contractual schedule with Grange.

Dubai / Dubai Marina
Marina Cove
Unit-schedule target: October 2029
1- to 4-Bedroom Apartments
View project detail
Marina Cove by Emaar in Dubai Marina, Dubai.
Emaar’s H1 2026 investor presentation reports this project under development as of 30 June 2026. It remains in the current official catalogue checked 18 October 2026. Status after the report date is not independently verified. Ask Grange for the latest handover schedule.
Official project information · Dated development evidence
The sourced price basis is labelled above. Current availability requires confirmation.
Developer visualisations are indicative and do not show current construction or finished condition.
Completion information rechecked 11 November 2026. Based on the developer’s public unit payment schedule for DM Marina Cove-1-103. Dates and terms can differ by unit, building or phase; confirm the selected home’s contractual schedule with Grange.

Dubai / Emaar South
Golf Acres
Unit-schedule target: December 2028
1 to 3-bedroom apartments and 3-bedroom townhouses
View project detail
Golf Acres by Emaar in Emaar South, Dubai.
Emaar’s H1 2026 investor presentation reports this project under development as of 30 June 2026. It remains in the current official catalogue checked 18 October 2026. Status after the report date is not independently verified. Ask Grange for the latest handover schedule.
Official project information · Dated development evidence
The sourced price basis is labelled above. Current availability requires confirmation.
Developer visualisations are indicative and do not show current construction or finished condition.
Completion information rechecked 11 November 2026. Based on the developer’s public unit payment schedule for ES Golf Acres-G-TH06. Dates and terms can differ by unit, building or phase; confirm the selected home’s contractual schedule with Grange.

Dubai / Dubai Creek Harbour
Valo
Unit-schedule target: January 2028
1,2 & 3-Bedroom Apartments; 3-Bedroom Townhouses
View project detail
Valo by Emaar in Dubai Creek Harbour, Dubai.
Emaar’s H1 2026 investor presentation reports this project under development as of 30 June 2026. It remains in the current official catalogue checked 18 October 2026. Status after the report date is not independently verified. Ask Grange for the latest handover schedule.
Official project information · Dated development evidence
The sourced price basis is labelled above. Current availability requires confirmation.
Developer visualisations are indicative and do not show current construction or finished condition.
Completion information rechecked 11 November 2026. Based on the developer’s public unit payment schedule for DC Valo-P1-P103. Dates and terms can differ by unit, building or phase; confirm the selected home’s contractual schedule with Grange.

Dubai / Dubai Hills Estate
Club Place
Unit-schedule target: November 2027
1, 2 and 3 Bedroom Apartments
View project detail
Club Place by Emaar in Dubai Hills Estate, Dubai.
Emaar’s H1 2026 investor presentation reports this project under development as of 30 June 2026. It remains in the current official catalogue checked 18 October 2026. Status after the report date is not independently verified. Ask Grange for the latest handover schedule.
Official project information · Dated development evidence
The sourced price basis is labelled above. Current availability requires confirmation.
Developer visualisations are indicative and do not show current construction or finished condition.
Completion information rechecked 11 November 2026. Based on the developer’s public unit payment schedule for DE Club Place A-1-103. Dates and terms can differ by unit, building or phase; confirm the selected home’s contractual schedule with Grange.

Dubai / Dubai Marina
Marina Shores
Unit-schedule target: June 2027
1–5 bedroom apartments; 5-bedroom penthouse
View project detail
Marina Shores by Emaar in Dubai Marina, Dubai.
Emaar’s H1 2026 investor presentation reports this project under development as of 30 June 2026. It remains in the current official catalogue checked 18 October 2026. Status after the report date is not independently verified. Ask Grange for the latest handover schedule.
Official project information · Dated development evidence
The sourced price basis is labelled above. Current availability requires confirmation.
Developer visualisations are indicative and do not show current construction or finished condition.
Completion information rechecked 11 November 2026. Based on the developer’s public unit payment schedule for DME Marina Shores-45-4505. Dates and terms can differ by unit, building or phase; confirm the selected home’s contractual schedule with Grange.

Dubai / Emaar Beachfront
Bayview by Address Resorts
Unit-schedule target: July 2028
Apartments and penthouses; exact bedroom mix available on request
View project detail
Bayview by Address Resorts by Emaar in Emaar Beachfront, Dubai.
Emaar’s H1 2026 investor presentation reports this project under development as of 30 June 2026. It remains in the current official catalogue checked 18 October 2026. Status after the report date is not independently verified. Ask Grange for the latest handover schedule.
Official project information · Dated development evidence
The sourced price basis is labelled above. Current availability requires confirmation.
Developer visualisations are indicative and do not show current construction or finished condition.
Completion information rechecked 11 November 2026. Based on the developer’s public unit payment schedule for EB Bayview T2-10-1002. Dates and terms can differ by unit, building or phase; confirm the selected home’s contractual schedule with Grange.

Dubai / Grand Polo Club & Resort
Selvara 3
Unit-schedule target: May 2029
4-bedroom Luxury Villas
View project detail
Selvara 3 by Emaar in Grand Polo Club & Resort, Dubai.
Emaar’s H1 2026 investor presentation reports this project under development as of 30 June 2026. It remains in the current official catalogue checked 18 October 2026. Status after the report date is not independently verified. Ask Grange for the latest handover schedule.
Official project information · Dated development evidence
The sourced price basis is labelled above. Current availability requires confirmation.
Developer visualisations are indicative and do not show current construction or finished condition.
Completion information rechecked 11 November 2026. Based on the developer’s public unit payment schedule for GP Selvara 3-V-106. Dates and terms can differ by unit, building or phase; confirm the selected home’s contractual schedule with Grange.

Dubai / Rashid Yachts & Marina
Clearpoint
Unit-schedule target: August 2027
1, 2 and 3 bedroom apartments; 3-Bedroom Duplex Apartments
View project detail
Clearpoint by Emaar in Rashid Yachts & Marina, Dubai.
Emaar’s H1 2026 investor presentation reports this project under development as of 30 June 2026. It remains in the current official catalogue checked 18 October 2026. Status after the report date is not independently verified. Ask Grange for the latest handover schedule.
Official project information · Dated development evidence
The sourced price basis is labelled above. Current availability requires confirmation.
Developer visualisations are indicative and do not show current construction or finished condition.
Completion information rechecked 11 November 2026. Based on the developer’s public unit payment schedule for RY Clearpoint Building 2-G-G06. Dates and terms can differ by unit, building or phase; confirm the selected home’s contractual schedule with Grange.

Dubai / Rashid Yachts & Marina
Sera 2
Unit-schedule target: November 2029
1-3 Bedroom Luxury Apartments; 3 Bedroom Townhouses
View project detail
Sera 2 by Emaar in Rashid Yachts & Marina, Dubai.
Emaar’s H1 2026 investor presentation reports this project under development as of 30 June 2026. It remains in the current official catalogue checked 18 October 2026. Status after the report date is not independently verified. Ask Grange for the latest handover schedule.
Official project information · Dated development evidence
The sourced price basis is labelled above. Current availability requires confirmation.
Developer visualisations are indicative and do not show current construction or finished condition.
Completion information rechecked 11 November 2026. Based on the developer’s public unit payment schedule for RY Sera 2 B-2-202. Dates and terms can differ by unit, building or phase; confirm the selected home’s contractual schedule with Grange.

Dubai / Zabeel
Address Residences Zabeel
Unit-schedule target: September 2029
1-3 bed apartments and penthouses
View project detail
Address Residences Zabeel by Emaar in Zabeel, Dubai.
Emaar’s H1 2026 investor presentation reports this project under development as of 30 June 2026. It remains in the current official catalogue checked 18 October 2026. Status after the report date is not independently verified. Ask Grange for the latest handover schedule.
Official project information · Dated development evidence
The sourced price basis is labelled above. Current availability requires confirmation.
Developer visualisations are indicative and do not show current construction or finished condition.
Completion information rechecked 11 November 2026. Based on the developer’s public unit payment schedule for AZ Address Zabeel T3-52-5208. Dates and terms can differ by unit, building or phase; confirm the selected home’s contractual schedule with Grange.

Dubai / Dubai Hills Estate
Golf Hillside
Unit-schedule target: October 2027
1, 2 and 3 Bedroom Apartments
View project detail
Golf Hillside by Emaar in Dubai Hills Estate, Dubai.
Emaar’s H1 2026 investor presentation reports this project under development as of 30 June 2026. It remains in the current official catalogue checked 18 October 2026. Status after the report date is not independently verified. Ask Grange for the latest handover schedule.
Official project information · Dated development evidence
The sourced price basis is labelled above. Current availability requires confirmation.
Developer visualisations are indicative and do not show current construction or finished condition.
Completion information rechecked 11 November 2026. Based on the developer’s public unit payment schedule for DE Golf Hillside-P-P01. Dates and terms can differ by unit, building or phase; confirm the selected home’s contractual schedule with Grange.

Dubai / Emaar South
Golf Dale
Unit-schedule target: December 2028
Exclusive 1 – 3 bedroom apartments and 3 bedroom townhouses
View project detail
Golf Dale by Emaar in Emaar South, Dubai.
Emaar’s H1 2026 investor presentation reports this project under development as of 30 June 2026. It remains in the current official catalogue checked 18 October 2026. Status after the report date is not independently verified. Ask Grange for the latest handover schedule.
Official project information · Dated development evidence
The sourced price basis is labelled above. Current availability requires confirmation.
Developer visualisations are indicative and do not show current construction or finished condition.
Completion information rechecked 11 November 2026. Based on the developer’s public unit payment schedule for ES Golf Dale T2-G-G04. Dates and terms can differ by unit, building or phase; confirm the selected home’s contractual schedule with Grange.

Dubai / Emaar South
Golf Hills 2
Unit-schedule target: September 2029
1-3 Bedroom Apartments; 3 – bedroom Townhouses
View project detail
Golf Hills 2 by Emaar in Emaar South, Dubai.
Emaar’s H1 2026 investor presentation reports this project under development as of 30 June 2026. It remains in the current official catalogue checked 18 October 2026. Status after the report date is not independently verified. Ask Grange for the latest handover schedule.
Official project information · Dated development evidence
The sourced price basis is labelled above. Current availability requires confirmation.
Developer visualisations are indicative and do not show current construction or finished condition.
Completion information rechecked 11 November 2026. Based on the developer’s public unit payment schedule for ES Golf Hills 2-8-810. Dates and terms can differ by unit, building or phase; confirm the selected home’s contractual schedule with Grange.

Dubai / Rashid Yachts & Marina
Pier Point
Unit-schedule target: October 2028
1- to 3-Bedroom Apartments; 3-Bedroom Townhouses
View project detail
Pier Point by Emaar in Rashid Yachts & Marina, Dubai.
Emaar’s H1 2026 investor presentation reports this project under development as of 30 June 2026. It remains in the current official catalogue checked 18 October 2026. Status after the report date is not independently verified. Ask Grange for the latest handover schedule.
Official project information · Dated development evidence
The sourced price basis is labelled above. Current availability requires confirmation.
Developer visualisations are indicative and do not show current construction or finished condition.
Completion information rechecked 11 November 2026. Based on the developer’s public unit payment schedule for RY Pier Point 1-P-P04. Dates and terms can differ by unit, building or phase; confirm the selected home’s contractual schedule with Grange.

Dubai / Rashid Yachts & Marina
Marina Views
Developer target: December 2028
1- to 3-Bedroom Apartments; 3-Bedroom Penthouses
View project detail
Marina Views by Emaar in Rashid Yachts & Marina, Dubai.
Emaar’s H1 2026 investor presentation reports this project under development as of 30 June 2026. It remains in the current official catalogue checked 18 October 2026. Status after the report date is not independently verified. Ask Grange for the latest handover schedule.
Official project information · Dated development evidence
The sourced price basis is labelled above. Current availability requires confirmation.
Developer visualisations are indicative and do not show current construction or finished condition.
Completion information rechecked 11 November 2026. Published developer or sales-partner target; confirm the selected property’s current contractual schedule with Grange.
Completion source

Dubai / Rashid Yachts & Marina
Ocean Cove
Unit-schedule target: August 2028
1-, 2-, 3-Bedroom Apartments
View project detail
Ocean Cove by Emaar in Rashid Yachts & Marina, Dubai.
Emaar’s H1 2026 investor presentation reports this project under development as of 30 June 2026. It remains in the current official catalogue checked 18 October 2026. Status after the report date is not independently verified. Ask Grange for the latest handover schedule.
Official project information · Dated development evidence
The sourced price basis is labelled above. Current availability requires confirmation.
Developer visualisations are indicative and do not show current construction or finished condition.
Completion information rechecked 11 November 2026. Based on the developer’s public unit payment schedule for RY Ocean Cove Building 1-1-118. Dates and terms can differ by unit, building or phase; confirm the selected home’s contractual schedule with Grange.

Dubai / Dubai Creek Harbour
Palace Residences Creek Blue
Developer target: March 2029
1,2 & 3-Bedroom Apartments
View project detail
Price basis: developer-advertised starting price. Official price source.
Palace Residences Creek Blue by Emaar in Dubai Creek Harbour, Dubai.
Emaar’s H1 2026 investor presentation reports this project under development as of 30 June 2026. It remains in the current official catalogue checked 18 October 2026. Status after the report date is not independently verified. Ask Grange for the latest handover schedule.
Official project information · Dated development evidence
The sourced price basis is labelled above. Current availability requires confirmation.
Developer visualisations are indicative and do not show current construction or finished condition.
Completion information rechecked 11 November 2026. Published developer or sales-partner target; confirm the selected property’s current contractual schedule with Grange.
Completion source
BEFORE YOU RESERVE
Compare the complete cost and the home.
Alongside the location, home type, price and completion status shown above, ask Grange to confirm these details for your shortlisted unit:
- Exact floor plan, internal area and balcony or terrace area; floor, outlook, parking and furnishing specification.
- Current unit availability, full price, reservation terms and the dated payment schedule.
- Registration and other purchase fees, service-charge estimate and any ongoing management or branded-residence charges.
- Developer registration, escrow details, ownership eligibility and the completion and handover terms in the sale agreement.
Advertised starting prices and payment plans are indicative, not a quotation or confirmed allocation. Completion dates are developer targets unless a handover status is stated. Where a date is not verified, it is labelled as awaiting confirmation.
Ask Grange for a unit-specific breakdownBuild your shortlist
Compare Dubai off-plan homes
Begin with the setting and home type that suit your daily life, then compare the details of the homes available.
Park-led apartment living. Hillsedge in Dubai Hills Estate focuses on one- and two-bedroom apartments beside Hillside Park. Compare the internal layout and balcony space with the routes you use for work, shopping and time outdoors.
A choice of homes by the Creek. Albero and Creek Waters 2 both sit within Dubai Creek Harbour. Each includes apartments and three-bedroom townhouses; Creek Waters 2’s wider mix also includes four-bedroom apartments and five-bedroom duplex penthouses. Their project pages explain the layout differences to consider.
Branded marina living. Baystar by Vida at Rashid Yachts & Marina combines the Vida residential identity with a marina setting. Alongside the apartment plan and outlook, review the written service arrangements and ongoing ownership costs.
Townhouses and larger villas. DAMAC Islands in Dubailand offers a different search: multi-level homes within a lagoon-led community. Compare the layout code, plot, parking and usable outdoor space. Keep the original development distinct from DAMAC Islands 2 when requesting details.
Make the price comparison like for like. Budget filters use the published price basis shown on each card. A starting figure may refer to a particular bedroom type or an advertised launch price; it is not a quotation for every home in that project. Compare the same bedroom count and indoor space, then ask for the current payment dates, fees and handover target for your selected properties.
Ask Grange for a shortlist with your preferred location, bedrooms, budget and timing. We can help you focus on the homes that fit those requirements.
New from Nakheel
Palm Springs
Your requirements
Enquire about a project
Start with your name and contact number. Add more preferences if you wish. Prefer to talk? Call +971 56 829 4492.
Contact our sales team for current availability, payment terms and a shortlist that fits your requirements.
